The Cave-in-waiting-to-happen Lateral Line Replacement of 2022 is under way. I’ll have three new stacks, two new floor drains, a new toilet, a new standpipe for the washer, and a new utility sink when this is all done. Maplewood Plumbing rocks! And digs. And glues together new pipes too! The demo/construction crew found that theContinue reading “Lateral line”
