Renovation update

At 5 p.m. Thursday, the cabinets were all back in place, and electric was finished as well.

The clean-up and put-it-all-back-in-place this morning took two hours.

Sadly for me, when I came home last evening, I found that something underneath the cabinets has a slow leak, and water is standing on the floor near the sink.  We are not amused.

I’ll be calling my neighbor Will-the-Plumber when he arrives home from work today.

And now to the housecleaning……

——————————

11.30 a.m.  The first floor is clean.  Swept.  Mopped.  Dusted.  Polished.  Tidied.  Un-trashed and now recycled.

Now for the second floor, which includes bathroom.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.